9th December 2015
The annual Fleming Award, sponsored by Cementation Skanska.
The Finalists:
Project | Teams |
Deep Basement for Exhibition Road Building, Victoria and Albert Museum, London | Arup, AL_A, Wates Construction |
Chantry Lane Chalk Mines Remediation, Hatfield, Hertfordshire | BAM Ritchies, Welwyn and Hatfield BC, MACE, Arcadis Consulting (UK) Ltd |
Deep Basement for British Museum World Conservation & Exhibition Centre, London | Ramboll, Rogers Stirk Harbour + Partners, Mace, Arup, Bachy Soletanche, Keller, P J Carey, Rowecord, GIG Fassaden |
On
This presentation will review the background to the Observational Method process. It introduces the new holistic approach to the Observational Method set out in the revised Ciria C580 (renamed C760), which is related to the Eurocode 7 requirements for the Observational Method and design parameters. Reviews of recent projects which have applied the Observational Method will be used to explain the C760 approach to design.
The use of real time monitoring and back analysis is discussed, together with current research into the reassessment of characteristic and most probable soil parameters using probabilistic methods.
Download: Fleming BGA final flyer 2015